- Home
- Services
Five kinds of commercial electrical installation, each priced from a site walk.
This is the full list of what the crew installs and repairs for Phoenix tenants, landlords and general contractors. Each section below says what the job covers, what it is built from, the parts of the schedule we don't control and how the quote is worked out. No figure here is binding. The binding one is in the written scope.
Tenant-improvement electrical fit-out
Plate 01 · TI fit-out
A tenant improvement electrician gets handed a suite that is either a bare shell or someone else's leftover layout. We work from your architect's drawings, or we help get them drawn, and we build to the GC's schedule rather than our own.
The typical Phoenix TI is a retail bay, a restaurant or an office suite in a single-story strip or a tilt-up. Open deck above, demised walls between tenants. We run EMT on the open deck because it is the raceway, it is the ground path and it can be added to later. MC cable goes inside the demised and partition walls where pulling conduit would mean opening finished drywall. Mixing the two is normal. Mixing them without a plan is how you end up with a junction box nobody can reach.
Distribution starts at the tenant panel. Most suites we see are fed at 208Y/120V three-phase from the landlord's switchboard, and the first question is whether the existing feeder and meter can carry what the tenant wants to plug in. A restaurant with a hood, a walk-in and a 40-gallon water heater is not the same load as the nail salon that left. We check before we draw.
The thing that goes wrong most on TIs is coordination, not wiring. Ceiling grid goes in before the rough inspection, a mechanical sub lands a rooftop unit where the disconnect was meant to go. Our foreman sits in the GC's site meetings and keeps a written list of what is waiting on whom.
- Scope
- Tenant panel and feeder tie-in, branch circuits, receptacles, data rough-in boxes, lighting and controls, equipment connections for HVAC and kitchen gear, exit and emergency lighting.
- Materials
- THHN/THWN-2 copper in EMT on open deck. MC cable in demised and partition walls. Steel boxes. Conductors derated for plenum and rooftop runs.
- Who it suits
- General contractors, landlords preparing a vacant suite, operators fitting out a new lease.
- Lead time
- Set by the permit and the GC's schedule. Panels and fixtures are ordered once the scope is signed. Long-lead items are named in the scope.
Fixed written quote after site walk and plan review.
Service and switchgear upgrades, 200A to 1200A
Plate 02 · Service
A commercial panel upgrade in Phoenix usually starts with a tenant who needs more than the building has. A new kitchen line, a second compressor, a bank of chargers. The service that was fine in 1998 is not fine now.
We do single-phase and three-phase service upgrades from 200A to 1200A, including new switchboards, meter sections and the feeders between them. The work is mostly planning. A three phase service upgrade means the building is dark while the old gear comes out, so the shutdown is scheduled at night or on a weekend, agreed in writing with every tenant on that service.
The utility is the piece nobody can rush. If the utility needs a service release, that adds lead time we don't control. We tell you that on day one, not week six. Larger switchgear can also sit on order for a long time, and we name the expected lead on the quote rather than discover it after you have signed a lease that depends on it.
On feeders: aluminum is fine, and on a long 800A run it can save a meaningful amount. It has to be terminated on lugs rated AL, with compound where the manufacturer calls for it, torqued with a calibrated wrench and marked. We see the alternative on service calls. It looks like discolored bus and a melted lug.
- Scope
- Load calculation, new service entrance, meter section, switchboard or panelboard, feeders, grounding electrode system, utility coordination and the planned shutdown.
- Ratings
- 200A to 1200A. 120/240V single-phase, 208Y/120V and 480Y/277V three-phase.
- Materials
- Copper or aluminum feeders per the scope, AL-rated mechanical or compression lugs, PVC underground, rigid or EMT above grade.
- Lead time
- Gear lead time and the utility's service release are both stated in the quote as outside our control.
Written quote; utility fees and utility lead time listed separately.
LED lighting retrofits and controls
Plate 03 · Lighting
This is the energy-efficiency side of the business. An LED lighting retrofit in Phoenix pays twice: less power for the lamps, and less heat dumped into a space the rooftop units are already fighting to cool.
Warehouses with metal-halide high-bays and offices with fluorescent troffers are the two jobs we see most. In a warehouse we work from a scissor lift, one bay at a time, so the racking below stays in use. The old fixture comes down whole and leaves on our van for recycling. In an office the troffers are usually swapped or retrofitted with LED kits, ceiling tile by ceiling tile, after hours if the floor is occupied.
Controls are where most of the saving hides and where most retrofits skip. Occupancy sensors in aisles and back rooms. Daylight sensors near skylights and storefront glass, which in Phoenix is a lot of the year. We would rather install fewer fixtures with working controls than more fixtures switched from one breaker.
We count every fixture before we price, because the number on the old drawings is never the number on the ceiling.
- Scope
- Fixture count and survey, removal and disposal of old fixtures and lamps, new LED fixtures or retrofit kits, occupancy and daylight controls, circuit labeling.
- Fixtures
- Round and linear LED high-bays for warehouse and shop floors. LED troffers and retrofit kits for 2×4 and 2×2 grid ceilings.
- Who it suits
- Warehouse and light-industrial tenants, retail floors, offices with dated fluorescent grids.
- Disruption
- Phased by bay or by room. Racking and desks stay in use outside the area under the lift.
Per-fixture line items in a written quote after a fixture count.
Commercial EV charger installation
Plate 04 · EV
Commercial EV charger installation starts with arithmetic, not hardware. The question is how much spare capacity your existing service has on the worst afternoon in August, when every rooftop unit is running.
We do the load calculation first, from the utility's demand data where you can get it and from a survey of the gear where you can't. That number decides how many Level 2 ports the building can carry as it stands, whether load management between chargers makes sense, or whether the honest answer is a service upgrade first.
Then the route. Wall-mounted units on the building side of a staff lot are the cheapest by a distance. Pedestals out in the lot mean trenching, which means saw-cutting asphalt, conduit at depth, a concrete pad and a patch. We coordinate the paving contractor and list their work separately so you can see what the trench costs on its own.
Conduit in an Arizona lot runs hot. Conductors to the chargers are sized for continuous load and for the temperature they actually sit in, not the table's default.
- Scope
- Load calculation, dedicated circuits and breakers, conduit and trenching coordination, pads, mounting, connection and commissioning of owner-selected or specified Level 2 units.
- Hardware
- Level 2 pedestals and wall units. Networked or standalone, chosen by you. We install to the manufacturer's instructions.
- Who it suits
- Office parks, retail centers, fleet yards and employers adding staff charging.
- Excluded
- Saw-cutting and asphalt repair are priced by the paving contractor. Charger network subscriptions sit with the supplier.
Written quote after a load calculation on the existing service.
Commercial electrical repair and troubleshooting
Plate 05 · Repair
Most commercial electrical repair calls are one of three faults: a breaker that keeps tripping, a termination that has run hot, or a circuit that has gone dead and nobody knows where it runs.
Nuisance tripping in Phoenix is often heat. A breaker in a panel on a west-facing wall in July is running close to its rating before any load is on it. We put a clamp meter on the conductor, read the actual current, look at the termination and decide whether it is an overloaded circuit, a failing breaker or a loose lug. Swapping the breaker for a bigger one is not a repair. We won't do it.
Hot terminations show up as discolored insulation, a smell, or a breaker warm to the touch. Those get fixed properly: cut back to clean conductor, re-terminated and torqued. Dead circuits get traced with a tracer and the panel schedule, and the schedule gets corrected while we are in it.
We work in occupied buildings, so the shutdown is the shortest we can make it and announced before it happens. For a dead service, a burning smell or anything that looks scorched, call the office on 623-209-5244 rather than sending a form.
- Typical calls
- Nuisance tripping, hot or loose terminations, dead circuits, failed receptacles and disconnects, unlabeled panels needing a survey.
- Tools
- True-RMS clamp meter, circuit tracer, calibrated torque screwdrivers and wrenches.
- Follow-up
- Anything bigger than a repair becomes a written scope before more work starts.
- Urgent
- Call, don't email. The office answers on 623-209-5244.
Hourly service call; rate given when you call, not a fixed price.
Residential work and energy use
Residential
Houses, when the crew has room.
Residential installs, repairs and maintenance come in and we take some of them. The crew and the van are set up for commercial work, though, and a house doesn't get priority over a tenant opening on a fixed date. Call and describe it, and we'll tell you straight whether a residential shop would serve you better.
Energy use
Where a Phoenix power bill actually comes down.
Lighting and controls first, because they are cheap per kilowatt-hour saved and they cut cooling load as well. After that, it is usually equipment running when nobody is there: timeclocks on signage and exhaust fans, and circuits nobody switched off when a tenant left. We point those out on a site walk. We don't sell solar or make savings promises in figures we can't measure.
Next step
Every job above starts the same way: we walk the site first.
Background on the crew and how we run a site is on the about page.